top of page
case studies
FISHING SLICKLINE ON UNMANNED PLATFORM
5 May 2024 During routine slickline operations the slickline became stuck in the Stuffing Box during pull out of hole. Due to work hours...
RECOVERY OF 0.082” SLICKLINE
24 January 2024 OBJECTIVE: Our Customer r equired full tubing bore access to allow a temporary abandonment plug to be set in the tubing,...
GEOTHERMAL FISHING OPERATION
23 March 2024 OBJECTIVE: During initial well testing operations a Go Devil was used to tag TD of the well, although this operation had...
RECOVERY OF PERFORATING TOOLSTRING & 12M OF CABLE
Operational Summary Total operational time was 7 days, this included standby time for a cyclone & another period of excessive winds....
HIGH DEVIATION TOOLSTRINGS
Background: Due to our close working relationship with LiMar Oil Tools we were offered a set of their latest design YoYo subs to trial...
bottom of page